Traffic system and travel time

  • Cover_Rapport om 4 fase forundersøgelser 2021
    Report
    English Swedish

    This report presents what the Öresund Metro is, how it will affect the labour market and enterprise sector, the environment and climate and become part of the future European transport system. It also describes various collaborations that are behind the project and what needs to be done in...

    Published
    2021
  • Forside Greater Copenhagen Trafikcharter
    Report
    Danish English Swedish

    This charter represents a shared vision of how a wellfunctioning, robust and sustainable infrastructure will help to strengthen mobility and boost economic growth and welfare. The charter is a proposal for a dialogue with the state authorities on both sides of the Öresund.

    Published
    2020
  • Unlocking the transnational potential in the Fehmern Belt Region
    Report
    English

    The report examines the potential for an Öresund Metro between Copenhagen and Malmö. A metro can create a larger, stronger labour market and at the same time solve transport capacity challenges.

    Published
    2018
  • Fact sheet 3 - What is the Öresund Metro
    Fact Sheet
    English

    An Öresund Metro between Copenhagen and Malmö will ensure better coherence between the regions.

    Published
    2018
  • Faktablad 2 med karta
    Fact Sheet
    English Swedish

    An Öresund Metro between Copenhagen and Malmö will result in an expansion of the regions’ common labour market and an increase in the number of jobs within a radius of 60 minutes from 800,000 to 1.3 million.

    Published
    2018
  • faktablad med karta
    Fact Sheet
    English Swedish

    An Öresund Metro with departures every 1.5 minutes between Copenhagen and Malmö will reduce the travel time by around 20 minutes. The travel time will therefore be halved.

    Published
    2018
  • bild på omslag av rapporten
    Report
    Danish English Swedish

    Phase III examined the link with high-speed rail, weighting of the functionality, costs and environmental impacts, connecting-up of districts in Copenhagen and Malmö, effects of shorter travel time, and communication concerning an Öresund Metro.

    Published
    2017
  • bild på omslag av rapporten
    Report
    Swedish

    Phases I and II of the preliminary study examined construction technology, routing, station design, environmental impacts, socioeconomics and dynamic effects.

    Published
    2015
  • Sammenfatningsrapport Øresundsmetro teknik og anlæg
    Report
    Danish

    The report summarises analyses of the future Öresund transport system in which an Öresund Metro is also part of day-to-day life. Based on the experiences of establishing the metro in Copenhagen, the constructional considerations for a metro line running across the Öresund are summarised and the...

    Published
    2013
  • Øresundsmetro trafikprognoser cover
    Report
    Swedish

    The report gives an analysis and evaluation of three scenarios for the construction of an Öresund Metro. The analysis take into account the effect of various travel speeds and frequencies.

    Published
    2013